brand logo
Thabbowa reservoir sluice gates opened after heavy rains

Thabbowa reservoir sluice gates opened after heavy rains

20 May 2025 | BY Staff Writer

Due to heavy rainfall, two sluice gates of the Thabbowa Reservoir have been opened by 6 inches each, releasing 240 cubic feet of water per second, the Irrigation Department confirmed.


More News..